When a redesign is needed
- Lab results fall outside the limits of the Wastewater Discharge and Reuse Regulation (Decree 33601-MINAE-S).
- The Ministry of Health has issued a health order.
- The project grew and the plant is now too small.
- There are odors, foam, escaping sludge or overflows.
- The system uses too much energy or needs too much maintenance.
How we do it
- Diagnosis of each unit, the available lab results and how the plant is operated.
- Proposal explaining what to fix, in what order and why.
- Permit application to the Ministry of Health to modify the system.
- Works and start-up, checking that the treated water complies.

