Skip to content
Ingeniería de las Aguas

Improved septic tanks

Improved septic tanks for your home, designed by an engineer

Many septic tanks are installed without a design and with a drain field that does not match the soil. An improved septic tank treats the water better, meets the regulations and prevents the overflows that keep coming back.

Cámara de un filtro con tuberías verticales de PVC en un sistema de tratamiento

What an improved septic tank is

A septic tank followed by an upflow anaerobic filter. The tank separates solids; the filter, packed with media where bacteria grow, keeps treating the water as it flows upward. The water then goes to the drain field or the next treatment stage.

What we do

  • New system design for homes and lots without public sewer, sized for the number of people and the soil.
  • Redesign of existing systems that overflow, smell or do not meet current regulations.
  • Drawings and documents for the building permit.

The drain field is half the system

A poorly sized drain field is one of the most common causes of overflows. The design starts with a percolation test. Subsurface disposal of treated wastewater is regulated by Decree 42075-S-MINAE.

Frequently asked questions

How is it different from a regular septic tank?

It adds an upflow anaerobic filter after the tank, which keeps treating the water before it reaches the drain field. The result is cleaner effluent and a longer-lasting drain field.

Why does the percolation test matter?

It measures how much water the soil absorbs. The drain field is sized from that number; without it, drain fields are often too small and the system overflows.

My septic tank overflows. What should I do?

Have both the tank and the drain field checked before making changes. Very often the problem is the drain field, not the tank.

Let’s talk about your project

Buying land, building, or fixing a system?

Send us the location and a few photos on WhatsApp. We reply with a clear plan and a quote.

Chat on WhatsApp