Stages we cover
- Intake and pretreatment to remove solids and materials that damage the system.
- Physical, chemical and biological treatment according to the type of water and the regulations.
- Monitoring and control: sampling points, control panels and automation.
- Distribution or disposal: safe distribution of drinking water, or controlled discharge, infiltration or reuse of treated wastewater, as approved.
- Start-up: commissioning, adjustments and operator guidance.
Public works
We work with public institutions on drinking water and sanitation systems, including the procedures for handing systems over to AyA when a project requires it.

