Skip to content
Ingeniería de las Aguas

Greater San José

Wastewater treatment plants and septic systems in Escazú and Santa Ana

Escazú and Santa Ana are the west side of San José where many foreign families and executives live, in gated condos, hillside homes and new mixed-use buildings. Some streets have sewer, many properties do not, and condo plants carry legal duties.

PoasGreciaSarchiNaranjoZarceroPalmaresAtenasOrotinaSan MateoSan RamonAlvaradoParaisoOreamunoVazquez de CoronadoGoicoecheaEl GuarcoCartagoLa UnionCurridabatMontes de OcaMoraviaSan IsidroTibasSanto DomingoSan PabloSan RafaelHerediaFloresBelenSan JoseBarvaSanta BarbaraDesamparadosAserriAlajuelitaEscazuSanta AnaMoraAlajuelaTilaranCanasBagacesLiberiaLa CruzCarrilloSanta CruzNicoyaHojanchaNandayureAbangaresEsparzaMontes de OroPuntarenasGarabitoQueposParritaPuerto JimenezOsaBuenos AiresCoto BrusGolfitoCorredoresPerez ZeledonTalamancaLimonMatinaSiquirresGuacimoPocociTurrialbaJimenezDotaLeon Cortes CastroTarrazuAcostaSarapiquiRio CuartoPuriscalTurrubaresSan CarlosLos ChilesGuatusoUpala

Escazú and Santa Ana, on the west side of San José, are where many foreign families, executives and retirees choose to live in the Central Valley. The housing is varied: gated condominiums, townhouse developments, hillside homes in the Escazú mountains, older houses on large lots, and new towers and mixed-use buildings along the main roads. Each canton has its own municipality, Escazú and Santa Ana, which handles construction permits.

Unlike the beach towns, this is an urban area. Some streets have a sanitary sewer; many properties, especially condos, hillside homes and newer developments, treat their own wastewater. Knowing which case you are in is the first step.

Sewer or your own system?

Before designing anything, find out whether a sanitary sewer runs in front of the property and whether its operator, usually AyA (Costa Rica's national water and sewer utility), accepts the connection. If it does, the project may avoid a full treatment plant, although wastewater sent to a sewer still has to meet the limits for sewer discharge in Decree 33601-MINAE-S, and non-domestic wastewater may need pretreatment.

If there is no sewer, the property needs one of two solutions:

  • a septic system (septic tank plus drain field) for homes and small buildings using up to 190 cubic meters of drinking water a month, under Decree 42075-S-MINAE;
  • a treatment plant approved under Decree 39887-S-MINAE for anything larger, such as condos, office buildings and commercial centers.

Condos: plants with paperwork

Many gated condominiums in Escazú and Santa Ana have their own treatment plant, built when the project was developed. Years later, the residents' association (often called the HOA by foreign owners) is responsible for it, and the duties are real:

  • routine measurements of flow, pH, settleable solids and temperature;
  • lab analyses every six months for flows up to 100 cubic meters per day, or every three months above that;
  • operational reports to the Ministry of Health on the same schedule, within 10 business days after each period, prepared in the Ministry's SIRROAR online system;
  • a logbook of operation, maintenance, incidents and sludge removal.

Our page on HOA wastewater plant compliance explains each one in plain English.

Common problems we see in older condo plants here: more units or more residents than the design assumed, equipment that has been patched instead of replaced, odors that bother neighbors in a dense area, and lab results that fail intermittently. An engineering review usually tells you whether you need better operation, a partial upgrade or rehabilitation, or an expansion. If you are buying into a condo, read our checklist for buying a condo with a treatment plant.

Hillside homes in Escazú

The upper parts of Escazú are steep. For a house with a septic system, Decree 42075 does not allow drain field trenches on slopes steeper than 30 %, and asks for a 2-meter setback from the top of slopes steeper than 25 %. The regulation also sets a higher design flow for the metropolitan area: 300 liters of wastewater per person per day, compared with 240 in other urban areas. On a steep lot with a large house, those two facts together can make the drain field the hardest part of the project. Sometimes the answer is to pump treated water to a better part of the lot with a small pumping station, or to choose a compact treatment unit.

For houses that already have a septic system and give trouble, start with septic smells and overflows. For new homes, an improved septic tank with a drain field designed from a percolation test is the usual starting point.

Stormwater: the urban issue

Every new roof and driveway sends more rain, faster, into streets and creeks. Municipalities in the metropolitan area review where projects discharge their stormwater, and creeks that cross Escazú and Santa Ana respond quickly to heavy afternoon storms in the rainy season. A proper stormwater drainage design protects your neighbors and also your own wastewater system: rainwater that gets into a septic tank or plant dilutes the treatment and can flood the drain field.

How we help in Escazú and Santa Ana

Ingeniería de las Aguas, based in Palmares, Alajuela, works throughout the Greater Metropolitan Area. We:

  • review, optimize, upgrade and rehabilitate condo and commercial treatment plants;
  • design and build new plants, sanitary sewers, pumping stations and stormwater drainage;
  • design and build improved septic systems and drain fields from the percolation test results;
  • prepare operational analyses and reports and follow up on system performance;
  • handle permits with the Ministry of Health, MINAE, SETENA, AyA and the municipalities of Escazú and Santa Ana, and supervise construction.

Looking for a quieter place further west? See Atenas and Grecia.

Send us the location, the type of property and, for condos, the latest operational report, on WhatsApp, or use our contact page.

Frequently asked questions

How do I know if my property in Escazú or Santa Ana can connect to a sewer?

Ask the sewer operator for the area, usually AyA, the national water and sewer utility, whether a sanitary sewer runs in front of the property and whether it accepts new connections. Where there is no sewer, the property must treat its own wastewater with a septic system or a treatment plant.

Our condo has its own plant. What does the HOA have to do?

Under Decree 33601-MINAE-S the condominium, as the generating entity, must keep a logbook, run routine measurements and lab analyses, and file operational reports with the Ministry of Health every six or three months depending on flow. Reports are due within 10 business days after each period ends.

What flow does a house in the metropolitan area use for septic design?

Decree 42075-S-MINAE uses a wastewater flow of 300 liters per person per day for the San José Metropolitan Area, based on a drinking water allowance of 375 liters with an 80 % return factor. The engineer may adjust for real occupancy, but cannot go below what the regulation sets.

Why does the municipality ask about stormwater?

New construction adds roofs and paving, so more rain runs off faster into streets and creeks. Municipalities review where a project sends its stormwater. Keeping it separate from the wastewater system also protects your septic tank or treatment plant from flooding.

Let’s talk about your project

Buying land, building, or fixing a system?

Send us the location and a few photos on WhatsApp. We reply with a clear plan and a quote.

Chat on WhatsApp