Skip to content
Ingeniería de las Aguas

Design

Wastewater and drinking water treatment plant design

Good design prevents two problems at once, a plant that does not comply and a plant that costs more than it should. We design every system for its own project, with the calculations and drawings the authorities require.

Formaleta y acero de refuerzo de los tanques de una planta en construcción

What the design includes

  • Site and project review: land, use, number of people and the water to be generated or treated.
  • Flow calculation and selection of the technology that meets the regulations at the lowest building and operating cost.
  • Drawings, calculations and specifications for each unit: pretreatment, biological treatment, clarification, disinfection and sludge handling, as needed.
  • Operation and maintenance manual written for the person who will run the system.
  • Technical documents for permits: system location, discharge and environmental approval, depending on the project.

Who we design for

Homes and lots without public sewer, condos, hotels, restaurants, businesses, industries and public institutions.

Sustainable from the drawing board

Most of a plant's operating cost is decided at the design stage. We look for efficient solutions, durable materials and, where the regulations allow it, reuse of treated water.

Frequently asked questions

What do you need to start a design?

The site location, the type of project (home, condo, hotel, business or industry), the number of people or units and, if available, the project drawings.

Do you also design drinking water systems?

Yes. We design treatment for wastewater and for water intended for human consumption, following current Costa Rican regulations.

Let’s talk about your project

Buying land, building, or fixing a system?

Send us the location and a few photos on WhatsApp. We reply with a clear plan and a quote.

Chat on WhatsApp