In short
A hotel with its own treatment plant files an operational report every six months if average flow is up to 100 m³ a day, and every three months above that. We visit the plant, arrange the lab sampling and analysis, write the report, file it in SIRROAR and remind you before the next one. You pay the lab fee plus our fee, quoted up front.
Along the Guanacaste coast and the Pacific, there is little or no public sewer, so many hotels treat their own wastewater. If yours does, the Ministry of Health expects an operational report (reporte operacional) at regular intervals, showing that the plant works and that the treated water meets the limits of Decree 33601-MINAE-S.
We take that off your plate. We visit the plant, arrange the sampling and analysis with a licensed laboratory, write the report, file it in SIRROAR, the Ministry's online system, and remind you before the next period. You never have to chase a lab or remember a date in the middle of high season.
Why a hotel report needs care
A beach hotel does not produce the same amount of wastewater all year. Occupancy peaks at Christmas, Easter week and the North American winter, and drops in the green season. That matters for the report:
- Frequency depends on average flow: every six months up to 100 m³ a day, every three months above that. A growing hotel can move from one category to the other.
- Timing of the sample matters. A sample taken with the hotel empty says little about how the plant handles a full house. The regulation asks for sampling in a representative period.
- Kitchen grease and laundry show up in the results. Grease and oils is one of the parameters tested in every report.
If you reuse treated water
Reusing treated water to irrigate gardens saves drinking water, and reuse is exempt from the discharge permit and the discharge fee. It also adds fecal coliforms and intestinal nematode eggs to the analysis, with stricter limits where guests have access. We include that in the sampling plan.
What we do every period
- Visit the plant, coordinated with your maintenance team, and measure the outflow.
- Arrange the composite sample and the analysis with a laboratory licensed by the Ministry of Health.
- Evaluate each treatment unit with the results and the period's occupancy.
- Prepare a corrective action plan if anything fails.
- File in SIRROAR, signed by the registered technical professional and the hotel's legal representative.
- Remind you before the next period.
Clear pricing
The laboratory fee plus our professional fee, quoted up front with no obligation. For the bigger picture on hotel plants, see wastewater treatment for boutique hotels and treatment plant compliance for condos, HOAs and hotels. Condos have their own page: operational reports for condos and HOAs. We work in Tamarindo, Santa Teresa, Jacó and Herradura and the rest of the country. Message us on WhatsApp to get started.
